The construction phase took place from July 23rd to September 15th when the final pour was made by Burnco.
![]() Framing the
footings |
![]() Pouring the
footings |
![]() Garth the
cribber starting the walls |
![]() Framing the
walls |
![]() Carol
chatting with John Carswell, engineer, and Matt the
draftsman. Note the parking lot forming in the
background and the basement walls to the left. |
![]() Burnco
getting ready to start pouring the walls |
![]() Garth and
crew doing final checks during the pour. |
![]() Pouring the
walls |
![]() Sabatini
technician doing the concrete slump test. |
![]() Slump test
showed concrete within acceptable limits |
![]() The south
wall. Note the beam pocket on top of wall. |
![]() North east
corner. Door goes to mechanical room. In
foreground is frost wall under patio door on west side. |
![]() Tim and Roger
mark the ground level on the basement walls. |
![]() Contractor
water coating the basement walls with tar. |
![]() Burnco
pouring the retaining walls |
![]() Pouring the
small retaining wall inside the building. Note the
insulation |
Retaining wall that nearly blew out |
Retaining wall that did blow out. |
| |
|
| |
|